top of page
All Posts


ACP-5 vs ACP-7: What NYC Contractors Need to Know Before Demo Starts
Most New York City demolition and alteration permits cannot move forward until the asbestos requirements have been addressed. Which filing the project needs depends on what a certified investigator finds and how much asbestos-containing material the work will disturb. Three outcomes are possible, and knowing which one applies shapes the entire schedule. An ACP-5 means no full asbestos project is required before the related DOB work proceeds. An ACP-7 means a full asbestos pro

Dev Deonarine
Aug 316 min read


Why Your Dumpster Load Was Rejected, Even Though It Looked Fine
A container that looked like a clean demo load at the job site can come back rejected from a transfer station. No visible garbage. No obvious hazardous material. Just a mix of debris that, somewhere in the load, crossed a line the receiving facility cannot ignore. NYC construction and demolition transfer stations operate under NYSDEC rules that define exactly what materials they may accept. When a prohibited material arrives, the facility has little discretion. It must separa

Dev Deonarine
Aug 55 min read


BIC Registration and NYC Construction Debris Hauling: What Contractors Need to Know
Most contractors in New York City know the name Business Integrity Commission. Fewer know what BIC registration actually requires, what it covers, and what the exposure looks like when the hauler on a job site doesn’t have one. Every company removing construction and demolition debris from a job site in New York City must be registered with the NYC Business Integrity Commission. That registration requires a background review process and is not transferable from one company to

Dev Deonarine
Jul 64 min read


What Goes in a Roll-Off Dumpster and What Doesn’t: Prohibited Materials NYC Contractors Get Wrong
A rejected roll-off container rarely starts with intentional rule-breaking. More often, it starts with one prohibited item loaded into an otherwise acceptable container. By the time the load reaches the receiving facility, the project is dealing with extra hauling costs, schedule delays, and disposal documentation problems that weren’t in the plan. There is also a more fundamental issue: not every hauler in New York City is legally authorized to remove construction and demoli

Dev Deonarine
Jun 95 min read
bottom of page
